The Engineering and Technical Service builds and maintains containment, power, the sites' machinery and the protected zones' walls, water and light.
1. Ranks
| Rank | Class | Clearance |
|---|---|---|
| Technician | C | Level 1 |
| Engineer | C | Level 2 |
| Senior Engineer | C | Level 3 |
| Chief Engineer | B | Level 4, site lead |
| Head of Engineering | B | Site-01 Level 4, federal head appointed by the O5 Council |
The Clearance column is the Site Clearance a rank usually holds at the member's posting. It is granted by that site's Director and does not carry to other sites or to Site-01 (Directive 001).
2. Duties
- Keep every containment system in working order and inspect it on schedule.
- Repair breaches in walls, doors and power within the time the Site Director sets.
- Build what the Scientific Department needs for approved tests.
- Keep the protected zones' infrastructure running with Civil Administration.
3. Work orders
- Any department lead may raise a work order with the Chief Engineer.
- The Chief Engineer sets its priority: containment first, then safety, then everything else.
- The engineer who finishes the work records it on the order.
4. During a breach
- Engineers report to the Security Chief and restore doors, locks and power to the sealed zone.
- Nobody enters a zone Security has not cleared.
5. What the department writes
Department procedures, exploration logs with the Mobile Task Forces, incident reports and posts. Reviews and approvals follow Foundation Directive 003.
6. Joining
Apply on Form A-01. A Senior Engineer reviews the application and runs an induction. You start as a Technician.
Revisions
| Revision | Date | Change |
|---|---|---|
| 0 | ████-██-██ | █████ █████. |
| 1 | ████-██-██ | █████████ ██████ is ████ █████████ at the ███████ (█████████ ███). |
| 2 | ████-██-██ | █████ ██████████████ is a ████████ of the ██████████████ ██████████. |
| 3 | ████-██-██ | ███████ ████ █████: ███ ███ ██████████ at ███████, █████████ by the ██ ███████ (█████████ ███). |